Lost Wax Casting Carbon Steel Investment Casting Agricultural Machinery Spare Parts
Basic Info.
Model NO. | MYCT21 |
Coating | Sodium silicate |
Machining Tolerance | +/-0.01mm |
Standard | ASTM |
Certification | ISO 9001:2008, IATF16949 |
Transport Package | Protective Bubble+Paper Carton+Wooden Case |
Specification | Custom metal parts |
Trademark | N/A |
Origin | China |
Production Capacity | 500000pieces/Year |
Product Description
Lost wax carbon steel investment Casting machining auto parts
Muyang machinery is a manufacturer with the capability of comprehensive services of casting, forging and machining, committed to the production of customized parts. Since established in 2002 (former Miaosen Machinery Co., Ltd), we've been supplying to the global market for over 15 years, served industries include automotive, railway, gas and oil, medical machinery, construction machinery, gym equipment, etc.
Material | Carbon steel, alloy steel, stainless steel |
Process | Casting + cnc machining |
Casting dimension tolerance | CT 6-8 |
Casting surface roughness | Ra 12.5um |
Casting weight range | 0.1-90kg |
Casting Size | Max linear size:1200mm, Max diameter size: 600mm |
Machining Precision | Positioning accuracy 0.008mm, Rep. position. accuracy 0.006mm |
Machining surface roughness | Ra0.8~6.3um |
Max Travel Of Spindle | 1800mmx850mmx700mm |
Max Turning Diameter | 1000mm |
Material standard | GB, ASTM, AISI, DIN, BS, JIS, NF, AS, AAR...... |
Surface treatment | KTL(E-coating), Zinc plating, Mirror Polishing, Sand Blasting, Acid pickling, black oxide, Painting, hot galvanizing, Powder coating, Nickel plating |
Service available | Mainly in accordance with customer specifications and drawings |
Quality standard | 0 defects,100% inspection before packing |
Application | Train & railway, automobile& truck, construction machinery, agricultural machinery, shipbuilding, construction, valve and pumps, electric machine, hardware, heavy duty equipment |
Project Time Management
Tooling: 25-35 days
Material: 5-7 days
Sampling: 7-15 days
Rough parts mass production: 30-50 days
Heat treatment: 5-7 days
Machining production: 10 -30 days
(The actual conditions are subject to the specific project)
We promise our clients careful, safe and tight package for exporting!
Standard packing: pearl cotton/bubble bag + carton box + pallet/wooden box
Special packing: custom packaging + wooden box
FAQ:
1. Are you a manufacturer or trading company?We're a manufacturer with self-export rights. 2. What's your main business?Our main business is custom metal parts processed by CNC machining, casting, forging, etc., and some other finished hardwares and garden supplies, served industries including railway, automobile, construction machinery, gym equipment, water gas and oil etc.3. Directly get to CONTACT or send your product drawing/inquiries to email, we will reply within 0.5 hour.